Floor Tiling – Do’s and Don’ts

Share

Dos

  • Always make sub-flooring before starting the floor tiling process.
  • Always check the tiles in dry form to get the right estimate of their sizes and design.
  • Make sure to level the floor during sub-flooring.
  • In the construction of commercial plazas, use laser levelling or laser alignment technology to check the level of the floor.
  • Make sure to do the grouting after one day of tiling.
  • Make special arrangements for floor tiling on the 1st and 2nd floors.
  • Use a blower in the tiles’ joints to clean them before grouting.

Visit TameerEasy Store to Purchase Quality Construction Items

Don’ts

  • Never select slippery tiles for your floor.
  • Never use loose material on the 1st and 2nd floors.
  • Never use tiles having different spacing among their joints.
  • To maintain the floor aesthetic, never use half-cut tiles on prominent points.

Quick Links

Quick Links

Popular Tags

Please select a taxonomy from the widget query settings

Popular Tags

Please select a taxonomy from the widget query settings
Share

Newsletter Sign Up

Sign up to our weekly newsletter to get the latest news and advice on all aspects of buying, selling, improving and managing property. Plus, get access to exclusive discounts and free tickets to shows.